Two weekends cut, assembly and glue, one weekend painting and doing the top (thatch) roof, and one Sunday to weather it up. No nails; all wood except the ladder rungs and the roof are cut from a single pallet. Ladder rungs are a dowel rod I had left from another project, roof is scrap plywood from a delivery box. Thatched roof is an old bamboo mat. Paint was old/unused portions as well. Total cost was $2.00 glue and $1.50 dowel rod, maybe $1 in sanding paper.
Next step, sandbags on the "front" side, and populate it with some figures and gear.
|